Service paths
The first service route is diagnosis. The team checks the current seat, cabin, dashboard trim, door panels, wiring, and user expectations. This prevents a quick but inaccurate recommendation.
The second route is execution planning. For seat heater, cooler, and massage installation, Tehran Sandali defines whether the project is product-only, product plus installation, restoration plus installation, or a full cabin project.
The third route is delivery control. Movement, wiring, switch operation, material fit, stitch direction, cabin cleanliness, and final user comfort should be checked before delivery.